NAVY

– General Dynamics Armament and Technical Products, Burlington, Vt., is being awarded a $12,481,289 modification to definitize the previously awarded letter contract (N00421-05-C-0110) to a firm-fixed-price.ย  In addition, this modification exercises an option for the procurement of 38 M61A2 20 mm automatic gun systems for the F/A-18E/F aircraft.ย  Work will be performed in Burlington, Vt., and is expected to be completed in September 2007.ย  Contract funds will not expire at the end of the current fiscal year.ย  The Naval Air Systems Command Aircraft Division, Patuxent River, Md., is the contracting activity.

McDonnell Douglas Corp., a wholly owned subsidiary of The Boeing Co., St. Louis, Mo., is being awarded a $44,286,967 modification to a previously awarded firm-fixed-price contract (N00019-06-C-0027) for 28 Harpoon all-up-round (AUR) missiles which consist of 20 tactical block II airlaunch AUR missiles for the Governments of Chile (10) and Pakistan (10); four exercise block II grade B AUR for the Government of Canada; two tactical block II Harpoon missile body AUR for the Government of Austrilia; and two tactical block II airlaunch AUR for the Government of Malaysia.ย  The contract also includes six warhead sections for the Governments of Canada (4) and Australia (2); 24 MK631 canister AUR containers for the Governments of Pakistan (10), Chile (10) and Canada (4); six MK992 exercise/warhead containers for the Governments of Canada (4) and Australia (2); and one MK607 airlaunch AUR container for the Government of Australia.ย  This contract combines purchases for the Governments of Chile ($15,843,630; 35.78 percent), Pakistan ($15,793,603; 35.65 percent), Canada ($7,600,780; 17.16 percent), Australia ($2,632,379; 5.95 percent) and Malaysia ($2,416,548; 5.46 percent) under the foreign military sales program.ย  Work will be performed in St. Charles, Mo. (50.28 percent), McKinney, Texas (14.12 percent), Toledo, Ohio (5.83 percent), United Kingdom (5.18 percent), Huntsville, Ala. (3.72 percent), Clearwater, Fla. (3.61 percent), Galena, Kan. (2.29 percent), Elkton, Md. (2.08 percent), Kirwood, Mo.(2.00 percent), Middletown, Conn. (1.78 percent), and other various locations throughout the United States (9.11 percent), and is expected to be completed in June 2007.ย  Contract funds will not expire at the end of the current fiscal year.ย  The Naval Air Systems Command, Patuxent River, Md., is the contracting activity.

AIR FORCE

Integral Systems Inc., Lanham, Md., is being awarded a $6,427,101 cost-plus-award fee contract modification.ย  This contract change modifies the command and control system-consolidated (CCS-C) effort to support the test automated operations (TAO) development for the wideband gapfiller satellite (WGS) program.ย  This change will also incorporate new WGS requirements.ย  The CCS-S program provides an upgraded capability to command and control the Air Forceโ€™s communication satellites, including the defense satellite communication system, Milstar, advanced extremely high frequency, and wideband gapfiller satellites.ย  At this time $2,756,535 has been obligated.ย  This work will be complete June 2010.ย  Headquarters Space and Missile Defense Systems Center, Los Angeles Air Force Base, Calif., is the contracting activity (F04701-01-C-0012/P00099).