PAX GATE HOURS
Credit – U.S. Navy

LEXINGTON PARK, Md. — Naval Air Station Patuxent River will close Gate 1 for scheduled maintenance on Wednesday, Nov. 5, beginning at 9:30 a.m., base officials announced.

Gates 2 and 3 will remain open and are expected to accommodate traffic while work is underway.

Base personnel, contractors, and visitors should plan for brief delays and allow extra travel time when entering or exiting the installation after 9:30 a.m. Traffic patterns near the main entrance may shift as drivers are redirected to alternate gates.

Tips for a smoother commute

  • Arrive early: Build in additional time for potential backup at Gates 2 and 3.
  • Have credentials ready: Ensure driver’s license/ID, base access card, and vehicle documents are easily accessible to speed screening.
  • Follow signage and security directions: Traffic control measures may change during the closure.
  • Coordinate deliveries/appointments: Vendors and visitors should confirm entry instructions with their base point of contact.
  • Consider off-peak travel: If your schedule allows, avoid the immediate period after 9:30 a.m. to reduce wait times.

Leave a comment

Your email address will not be published. Required fields are marked *